Independent Power Producer (Electricity).
1994
PT Paiton Energy was established in February 1994 and started commercial operation of two power plants (Units 7 and 8) in May and July 1999. The capacity of each unit is 615MW. Unit 3 having capacity of 815MW, is the first super critical coal fired power plant in Indonesia and started commercial operation in March 2012. Super Critical Boiler Technology provides a higher efficiency, a lower fuel (coal) consumption and subsequently lower CO2 emissions. The coals with extremely low sulphur and ash content are supplied from Kalimantan and Sumatra.
Distributor Required
Partnership Required
Looking to Sell
Looking to Buy